Staging - Emerson PLC Migrations 2 -

  • Home
  • Staging – Emerson PLC Migrations 2

Control System Migration Services

Legacy PLC, Motion, Drives & HMI

Managing the lifecycle of your control system can be a daunting risk. Migrating your existing control systems mitigates expensive and extensive downtime. A poorly executed upgrade presents the same risk.

Discover how our expert migration team can solve these lifecycle challenges with the experience to execute on schedule.

60

+

Years of Combined GE Experience

Aging PLC Systems Present Growing Operational Risk

Limited hardware and spare parts availability

Loss of internal logic knowledge as experienced engineers retire

Untitled-3

Vendor and support constraints

Increased risk of forced outages during failure

Real Results:

How Deep GE Expertise Reduced Downtime by 80%

A conveyor belt manufacturer in North Carolina needed to upgrade from GE 90-30 and 90-70 PLCs, but competitors estimated 4 months of downtime. TAG Solutions got it done in just 6 weeks.

Controlled Migration Through Parallel Conversion

Series 90-70 to RX3i Conversion Rack

This staged conversion approach allows existing GE 90-70 systems to remain operational while the new RX3i platform is installed, validated, and prepared for cutover. By preserving field wiring and leveraging conversion racks, downtime is planned, minimized, and controlled.

Why Facilities Modernize Legacy GE PLC Systems

Legacy GE PLC platforms such as the 90-30 and 90-70 are increasingly difficult to maintain, support, and expand. Planned modernization helps facilities reduce operational risk and maintain long-term reliability.

Reduce Downtime Risk

Aging PLC hardware and unsupported components increase the likelihood of unexpected outages and extended recovery times.

  • Obsolete or unsupported hardware
  • Limited spare parts availability
  • Time-consuming troubleshooting

Improve System Performance

Modern control platforms improve processing speed, communication performance, and overall system responsiveness.

  • Faster scan times
  • Improved network communication
  • Reduced cycle delays

Reduce Lifecycle Costs

Maintaining legacy systems becomes more expensive as hardware ages and vendor support declines.

  • Increasing maintenance costs
  • Limited vendor support
  • Higher failure risk

Modernize Controls

Aging PLC hardware and unsupported components increase the likelihood of unexpected outages and extended recovery times.

  • Obsolete or unsupported hardware
  • Limited spare parts availability
  • Time-consuming troubleshooting

The TAG Solutions Difference

Our Approach to Migrations

The TAG Solutions Migration Team has developed a proven strategy that will allow you to quickly and easily migrate from Series 90 and RX7i controllers and Series 90 I/O to an Integrated Modern Control System, while maintaining the existing field wiring and physical footprint in your control cabinet.

Proven GE PLC Expertise

Extensive GE migration experience supported by a formalized strategy.

Shutdown-Aligned Execution

Installations scheduled to align with plant outages and turnarounds.

Phased Migration Planning

Upgrades staged to match operational priorities and available budgets.

Vendor-Neutral Solutions

Recommendations focused on the best system for your facility.

Integrated Project Management

Dedicated coordination from planning through system replacement.

Multi-Discipline Engineering

Controls, networking, SCADA, cybersecurity, and electrical expertise.

Onsite Implementation Support

Engineering coordination during installation and system replacement.

Lifecycle Training & Support

Post-migration training and ongoing system support for your team.

Contact

Speak with a TAG Solutions engineer

Speak with a TAG Solutions engineer with direct experience migrating GE 90-30 and 90-70 control systems.

90-30 Migration to RX3i

Video series

Part 1

RX3i Upgrade Kit

Part 2

RX3i Hardware Upgrade Install​

Part 3

RX3i Software Upgrade Install